cExams.net
Test # 82


1.
The main difference between the two types (ADM, arrow diagramming method, and PDM, precedence diagramming method) of the critical path method (CPM) of scheduling is:

Login/Register to access massive collection of FREE questions and answers.
Login/Register

PMP Certification
Quiz Index
1500 questions in 150 tests. Each test contains 10 questions.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

Idiom of the Day

armed to the teeth
to be armed with many weapons
The police were armed to the teeth during the raid.

Word of the Day

  • Annoying Habits You Should Avoid Doing in Public
  • Best Natural Beauty Tips
  • Most Amazing Roads
  • Best Names at the Sochi Olympics
  • Myth about Acne
  • Benefits of Apples

  • Greatest Concept Cars Ever

    Audi Quattro Concept

    Combining fourwheel drive with a turbocharged engine for the first time ever in motoring history, the original Audi Quattro inevitably became a bit of an icon, not to mention a rally king. Plus it looks tougher than Jason Statham.

    Audi rightfully decided to celebrate the original Quattros 30th anniversary with the Audi Quattro concept, and was planning on selling between 200 and 500 cars. Sadly the concept ? and its 2.5litre turbocharged engine ? were canned in 2012.


    Chourishi Systems